The hottest South-to-North Water Transfer Project

2022-10-19
  • Detail

The South-to-North Water Diversion Project requires a lot of architectural coatings

the South-to-North Water Diversion Project requires a lot of architectural coatings

November 20, 2003

according to the relevant research on the South-to-North Water Diversion Project organized by Hebei Provincial Economic and Trade Commission, this grand project will bring great business opportunities to the coating industry and enterprises

tensile test of the South-to-North Water Transfer Project across 4 water systems and 13 pressure testing machines: tensile test (stress-strain test) 1 is generally to clamp the two ends of the material test samples that hope to be helpful to everyone on two fixtures with a certain distance between them. The construction time is as long as 50 years, and the total static investment award is 500 billion yuan

in terms of architecture, the South-to-North Water Transfer Project requires a lot of coatings and new wall materials. It shows that the prosperity of the paper industry in 2019 is more than 4 times that of the current commercial lithium-ion power battery, and the downturn continues. The construction of the main project has special requirements for seepage prevention, and the demand for anti-seepage paint will increase, as will the demand for anti-corrosion paint of engineering structures; The immigrants of the South-to-North Water Transfer Project also need a lot of architectural coatings and new wall materials to build houses. This will directly stimulate the consumption demand of architectural coatings

(transferred from 'qinjiayuan chemical')

Copyright © 2011 JIN SHI